by Jindra Cekan | Feb 13, 2016 | Aid effectiveness, Bill and Melinda Gates Foundation, Catholic Relief Services (CRS), Central Asia, Ethiopia, Ethiopian Red Cross, Evaluation, Federation of the Red Cross, Lutheran World Relief, Mercy Corps, Niger, PACT, Partners for Democratic Change, post-project evaluation, Sustainability, Sustainable development, Sustained and Emerging Impacts Evaluation, USAID
What happens after the project ends?
Lessons from post-project sustained impacts evaluations (Part 1)
We talk a lot about impact of our interventions, but far less is analyzed about the sustained impact of our work in the years after projects close out. We take for granted that successful strategies will continue after projects shut down. Do they always? Maybe they do but we don’t know. Maybe there are innovations and impacts to be learned from…
To answer these question Valuing Voices spent 2 ½ years looking for and analyzing ‘post-project’ evaluations of projects undertaken 2-10 years after projects ended. The result: in our $137 billon international development industry, some 99% of projects remain unevaluated after project close out [1]. Only 17 agencies we have found so far have publically available post-project evaluations; most of them have one, while the OECD and JICA have dozens. Hundreds of studies recommend such learning that is missing from our industry’s program cycle (green slice).

Six decades on, this astonishing finding raises serious questions about stewardship of resources and commitment to learning—particularly learning from participant and partner stakeholders for whom sustainability matters most, and who are tasked with it over the long-term.
A review of post project evaluations generate food for thought about good program design and illustrate the value added of post project perspectives. This rapid review of select ‘ex-post’ evaluations points to three early lessons:
How we do it matters for great results
Expect unexpected results
Who takes over? Country Nationals
First, organizations go back to see how well their projects results were sustained. What we learned was that how well they used participatory processes in how they implemented and handed over mattered a lot for sustainability and that we must expect unexpected results.
How we do it matters for great results
1. Catholic Relief Services/ USAID PROSAN food security project in Niger
Valuing Voices evaluated this food security (agriculture, health and resilience project in 2015 which ran from 2007-2012 (report forthcoming). The $32 million project was implemented in a consortium of CRS, CARE and Helen Keller but this evaluation focused only on CRS areas.
- Interviews with over 500 participants found that three years after project closeout, 80% of project activities still continued, as did many village committees and there were a variety of community innovations [2]
- On average, households can feed themselves through their own production or purchase of food for 8-12 months three years after closeout compared to 6-9 months at closeout three years earlier. Such impact was unexpected. [2]
- 91% of respondents reported improved household health, hygiene, and nutrition [2]
- A 2.5-year participatory exit process from CRS to country stakeholders (local government, an array of local and international NGOs and the private sector ensured continuity and boosted local ownership [2]
- 20% of the activities did not continue, mostly food-assisted NRM and resilience-related [2]
- Youth make up 50% of the population and need to be engaged during the project for long term sustainability to occur. [2]
2. PartnersGlobal (formerly Partners for Democratic Change)
Their mission is to “to build sustainable capacity to advance civil society and a culture of change and conflict management worldwide” uses an approach that is “bottom-up, locally-led rather than foreign-led, based on the belief that change comes from sustainable efforts led by local people, organizations and institutions invested in their own long-term future.” They went back and to review 55 case studies of projects through 22 centers they founded in central and eastern Europe from 1989-2011. They found:
- In 80% of cases, there was advancement of good governance by influencing the participation of civil society working with government [3]
- In 50% of the cases there was increased access to justice and managing and resolving disputes/conflicts, thereby strengthening civil society [3]
- 18 of 22 of the centers that had been established still exist today (82%) [3].
3. Mercy Corps
They did a post-project evaluation in Central Asia in 2007, one and three years after two conflict resolution projects ended which were worth $18 million. These complex community mobilization programs with aims “to empower communities to work together in a participatory manner to address the infrastructure and social needs [while] developing sustainable skills [and] empowers communities to identify and utilize existing resources within the communities and not to depend only on external assistance.”
- 72% of youth report that they continue to use at least one skill they learned during the programs (e.g. teamwork and communication, and skills such as sewing, construction, roofing, journalism and cooking) [4]
- 68% of community members witnessed local government becoming more involved in community activities after the end of the programs as compared with before the programs [4]
- 57% of the communities studied continuing to use one or more of the decision-making practices promoted during the program [4]
- 42% of members, representing 70% of communities, reported that the community had worked collectively on new projects or repairs to existing infrastructure. Participants and partners had implemented almost 100 infrastructure projects by themselves independent of donor funds. [4]
These are terrific expected results.
We also learned to Expect unexpected results
4. Federation of the Red Cross and Ethiopian Red Cross
Valuing Voices combined a final evaluation of “Building Resilient Community: Integrated Food Security Project to Build the Capacity of Dedba, Dergajen & Shibta Vulnerable People to Food Insecurity” that had funding over $3 million in 2009 from the Swedish Red Cross with an assessment of projected sustainability. It was an IFRC/ERCS collaboration with the Ethiopian government to provide credit for food security inputs to 2,259 households, which were to be repaid in cash over time as well water and agriculture/ seedlings for environmental resilience. We answered the DAC criteria for evaluation and found the project overall to be quite good, albeit with weak data tracking systems.
In terms of sustainability, we used participatory methods to learn about what people felt they could self-sustain once the project left their area, so we could shape a similar follow-on project design to be moved elsewhere in Tigray, particularly around the credit for animals.
- While 87% of the loans had been promoted by the government and given for large animals (oxen and cows), and 13% was for small animals (sheep, goats, chickens)…
- But project participants we interviewed, strongly preferred the small animals in terms of being able to sustain them on their own. They felt they could afford these smaller amounts of credit as well as the feed to sustain them, without taking the risk of animal death leaving them with large debt. This was especially true for women, who preferred poultry to all other animals 15:1.
In our quest for fast results, are we asking participants to bear too much risk? As one of our Valuing Voices team asks, Who is responsible for sustainability?
5. Lutheran World Relief
From 2005-2007 Lutheran World Relief intervened in Niger, the world’s poorest country, with a $500,000 Pastoralist Survival and Recovery Programme (ARVIP) drought rehabilitation project funded by the Bill and Melinda Gates Foundation. There were numerous outcomes from targeting sheep, wells and animal fodder to 600 of the poorest women in 10 communities in northern Niger, among them:
- Women’s share of household income increased from 5% to 25% in some households. This was due to the value of the sheep grants, as well as time-savings used for income generation. Access to wells in five of the villages saved women a staggering 7-10 hours every other day from not having to go fetch water 3.5 hours away each way for household and animal needs and were free to weave mats or cook food for sale [5]
- Many said they didn’t have to resort to worse survival strategies during the next hungry season after they received the sheep [5]
What was not expected were these results:
- Many women in several villages reported an impact that was completely unexpected to the implementer and donor which was “our husbands don’t beat us anymore” [5]. This was thanks to both increased respect and income from the sheep as well as access to well-water which led to cleanliness and their ability to be home for their husbands, children and mothers-in-law, rather than fetching water whole days 2-3 times a week. The same was found in PACT’s WORTH empowerment and village banking project in Nepal that wrote, “one in 10 reported that WORTH has actually helped “change her life” because of its impact on domestic violence” [6].
- We defined success too narrowly. Many interviewees were content with the project even though prospects for project-expected drought resilience or sustained food security were less likely. Some women sold the sheep to buy food, pay their children’s school fees or their daughters’ dowries, while some had their sheep sold by their husbands who used them to buy other animals, pay for ceremonies or other expenses. Participants saw the project as bringing them resources and considered it a success. Spending assets on immediate needs is not at all illogical for a community who can feed itself only 4 months a year; for some households, their pressing needs far outweighed the luxury to wait and buffer seasonal food insecurity far down the line.
We hope you agree that allocating funds and attention to post-project sustained impacts evaluations is necessary for the remaining 99% of international development projects as it offers a fantastic learning opportunity about how to ‘do development’ well now and for the future. Without returning to look for what participants and partners valued enough to continue on their own, without returning to learn about unexpected sustained impacts, we rob ourselves of pivotal learning needed for success.
In part two, we look at ownership onward, planning for handover and lessons from who takes over? Country Nationals. In part three, we focus on Funding, Assumptions and Fears.
Please join us in advocating for this! Please think about your own projects… and whether you have considered these things, or need our help. We’re listening!
Sources:
[1] OECD. (2015, December 22). Detailed final 2014 aid figures released by OECD/DAC. Retrieved from http://www.oecd.org/dac/stats/final2014oda.htm
[2] Cekan, J., PhD, Kagendo, R., Towns, A. (2016). Participation by All: The Keys to Sustainability of a CRS Food Security Project in Niger. Retrieved from https://www.crs.org/our-work-overseas/research-publications/participation-all
[3] Carstarphen, N., PhD. (2013, November). Sustainable Investment in Local Capacity for Democracy and Peace: A Global Evaluation of Partners for Democratic Change. Retrieved from https://www.partnersglobal.org/resource/sustainable-investment-in-local-capacity-for-democracy-and-peace/
[4] Westerman, B., & Sheard, S. (2007, December). Sustainability Field Study – Understanding What Promotes Lasting Change at the Community Level. Retrieved from https://reliefweb.int/report/world/sustainability-field-study-understanding-what-promotes-lasting-change-community-level
[5] Cekan, J. (2013). Increasing women’s incomes, increasing peace: Unexpected lessons from Niger. Participatory Learning and Action, (66), 75-82. Retrieved from https://pubs.iied.org/G03661/
[6] Mayoux, L. & Valley Research Group (2008, June). Women Ending Poverty: The WORTH Program in Nepal – Empowerment through Literacy, Banking and Business 1999-2007. Retrieved from https://www.findevgateway.org/case-study/2008/06/women-ending-poverty-worth-program-nepal-empowerment-through-literacy-banking
by Jindra Cekan | Dec 15, 2015 | 3ie, Aid effectiveness, DFID, Evaluation, ex-post evaluation, post-project evaluation, Sustainability, Sustainable development, USAID
Sustained Impact post-project (ex-post)? Little proof at 3ie

Surely an organization that has received tens of millions of dollars of funding must track ‘impact’ as the actual long-term impact of projects. That is what I thought when I first began exploring post-project sustainability. If you look at the International Initiative on Impact Evaluation (3ie), so respected in RCTs (randomized control trials), they do valuable work comparing international development interventions among participants versus control groups during implementation, showing which interventions work best. Valuable stuff. Yet in an earlier post on impact vs. sustainability, I looked at 3ie, and found that much of the impact seems to be projected, during implementation. Our projects’ ‘logical frameworks’ are designed to measure progress to get to outputs (e.g. farmers trained), outcomes (e.g. hectares planted with new seeds), impacts (e.g. higher harvests and lower malnutrition) and goals (e.g. hunger sustainably eliminated). So did we get to sustained impact and goals? Who is looking if we got there?
This kind of impact appears in OECD Post-2015: “how cost-effective is it? To what extent does aid help nurture solutions that are sustainable over time? In other words, is aid being delivered effectively and is it having an impact“ [1]? Post-project evaluations that would assess sustained impact don’t seem to widely be done or get much traction at the otherwise respected 3ie either. Returning a year later to 3ie since my first post, I found 18 documents under searches of ‘ex-post’ and ‘post project’. Sadly, again and again, their definition of ex-post seems to be post the onset of implementation, ranging from 1-2 years after the baseline rather than the typical definition of 2-10 years after projects actually closed, where long-term impact can be found.
When I searched by the more technical term ‘ex-post’ on 3ie, I found 17 that were titled ex-post but in fact were not. This ex-post evaluation of a conditional transfer in Costa Rica in fact was not one as they were comparing the efficacy of the project on school attendees in 2002 while the project was still underway. The French study of Cambodian healthcare was done firmly within implementation yet was titled ex-post. Another, evaluating a women’s group project in Kenya says they have a post-project evaluation but how can it be post project if it was only one and a half years after he baseline while still during implementation? A third “ex-post” on Job Youth training in the Dominican Republic only looks at the efficacy one year after the training, hence again during implementation and firmly not ex-post.
The only true ex-post was a 15-yea.r-old study by the World Bank in Nicaragua, comparing the impact of an emergency social investment fund for primary education, rural health and water/sanitation projects that were done from January 1994 to June 1997. It was evaluated two years after completion regarding targeting the poorest, community priorities and participation, projects’ utilization rates, and operational and physical sustainability and impact on beneficiaries’ health and education status. The rest of the documents on 3ie under ex-post were secondary systemic reviews of other project evaluations and a hopeful post that a new UK collaboration will track and improve aid impact [2]. While DIFD is doing terrific work on value for money, it focuses on donor money well spent rather than country-national participants and partners’ views of how well they felt our project money served them. But I quibble.
So is it a matter only of definition of what impact we’re looking for and expectations that we can find it during implementation rather than the dusty ankles post-project/ ex-post research Valuing Voices promotes? As a PhD I firmly expected to find many definitions and examples of real, sustained research on actual long-term impact and the 3ie site and on many donors’ sites. I am flabbergasted today at not only the lack of post-project/ ex-post evaluations but also that these terms seem not to be defined. There are no definitions or examples on Betterevaluation, nowhere on the American Evaluation site or within USAID’s Evaluation Policy [3], none at all in UK’s DFID’s annals on overseas aid effectiveness. Other Valuing Voices blogs have outlined the dearth of post-project evaluations. Only today did I realize even their definitions are scarce. One definition I did find was from the UK’s Department of Education:
The purpose of this post-project evaluation (PPE) is to:
- Evaluate the effectiveness of the project in realizing the proposed benefits [4]
- Compare planned costs and benefits with actual costs and benefits to allow an assessment of the project’s overall value for money to be made [4]
- Identify particular aspects of the project which have affected benefits either positively or negatively; [and make] recommendations for future projects [4]
- Reveal opportunities for increasing the project’s yield of benefits, whether they were planned or became apparent during or after implementation, and to recommend the actions required to achieve their maximisation [4]
Sustainability is the hoped-for outcome of ex-post evaluation work; so I have long turned to the OECD/ DAC have five related criteria for evaluating development assistance [5]. They define sustainability as concerned with measuring whether the benefits of an activity are likely to continue after donor funding has been withdrawn. Projects need to be environmentally as well as financially sustainable. When evaluating the sustainability of a programme or a project, it is useful to consider the following questions:
- To what extent did the benefits of a programme or project continue after donor funding ceased?
- What were the major factors which influenced the achievement or non-achievement of sustainability of the programme or project?
While this definition is 15 years old, it works quite well. Are you equally surprised at how hard it is to find definitions and examples of post-project and ex-post evaluations? 3ie doesn’t seem to have it down; USAID has hundreds of documents listed as ex-post. Some are secondary analyses of previous evaluations and most simply say post-project evaluation should be done. At least USAID has now two new ex-post studies (one in 2014, one in 2015). They are the first studies done in 30 years by USAID. The latter is a brave and fascinating one, where Tufts evaluates Food For Peace projects ex-post in four countries this month, with publicly mixed results. Even J-Pal, the highly-respected Abdul Lateef Jameel Poverty Action Lab does rigorous impact evaluations, comparing the outcomes of project activities to non-participant control groups to ascertain the effectiveness of the interventions, but it too seems to have no documents on their impact evaluation site that show the sustainability of impacts.
Putting ourselves in the shoes of those we indend to serve… the sustained impact is what they actually want.
When will our organizations actually go back to the field and learn from those living with the projects years after donors and implementers leave? When will we walk our accountability talk? DO TELL!
Sources:
[1] OECD. (2013). Element 10, Paper 1: Effective development co-operation: An important enabler in a post-2015 global development framework. Retrieved from http://www.oecd.org/dac/FINAL%20POST-2015%20Effective%20Development%20Co-operation.pdf
[2] White, H. (2011, May 23). New UK watchdog to improve aid impact. Retrieved from https://www.3ieimpact.org/blogs/new-uk-watchdog-improve-aid-impact
[3] Levine, R., & DeRuiter, D. (Eds.). (2015, September 22). USAID Evaluation Policy. Retrieved from https://www.usaid.gov/documents/1865/usaid-evaluation-policy
[4] UK Department of Education. (n.d.). Post Project Evaluation. Retrieved from https://www.education-ni.gov.uk/articles/post-project-evaluation
[5] OECD. (n.d.). DAC Criteria for Evaluating Development Assistance. Retrieved 2015, from https://web.archive.org/web/20151206171605/http://www.oecd.org/dac/evaluation/daccriteriaforevaluatingdevelopmentassistance.htm
by Rutere Kagendo | Nov 19, 2015 | Beneficiaries, Evaluation, Exit strategies, International aid, Local Participants, Participants, post-project evaluation, Project design, Rural Development, Sustainability, Sustainable development
Whose responsibility is it to sustain project activities?
Billions of dollars are pumped into development activities in developing countries all over the world. Communities getting involved in these projects have a clear objective, which is to have their lives improved in the sectors that the projects target. As to whether this is the main objective of the development partners is not clear. What is clear is that the development partners focus more on numbers than on getting people to participate.
We note that majority of these projects are designed to last between 2-5 years. Delays occasioned poor planning or other unforeseen factors eat into the implementation time to an extent that in some projects it takes about 1-2 years to get a program running. This means that the planned implementation time is reduced. Baselines, midlines and end lines studies are conducted to inform changes that may have occurred within the program life, and in most cases they happen shortly after the program has started or just before it ends. In fact, some baselines are conducted after programs have started.
Considering the reduced implementation time and the fact that it takes a much longer time to get concrete behavior change related results, questions emerge whether indeed the reported changes are solid enough during implementation to be sustained. There is also a difference between measuring what can be referred to artificial changes (activities that community members adopt as a way of short-term trial in their excitement, but don't find useful afterward) and long lasting changes that community members adopt because they are useful part and parcel of their lives.
Almost all projects have logical frameworks (logframes) that show how project activities will be implemented and to some extent there are also exit strategies for closing out the project. This can be an illusion long-term. In most cases donors and implementers assume that communities will adopt activities that are being implemented within a specified period of time, and so projects close down at the end of the specified period of implementation assuming things will continue, but have no proof. Valuing Voices has done projected sustainability work in Ethiopia which points to possible differences between what donors expect to the sustained versus what communities are able to sustain.
The big questions remain: "whose responsibility is it to ensure that whatever has been adopted is continued? Whose responsibility is it to sustain project activities post project implementation?" It is silently assumed that communities can take up this responsibility and a key question is "what guarantees are there that this is possible and is happening?" Project sustainability should not be seen as a community-alone responsibility but rather a responsibility for all those who are involved in program activities. Sustainability studies should be planned for and executed in the same breath that the baselines, midlines, end-lines and in the rare cases impact assessments in real time should be planned for. We must do sustainability studies as they provide an additional realistic opportunity to inform us on actual community development post project implementation. Communities should not be left alone with it.
by Jindra Cekan | Aug 28, 2015 | Accountability, Aid effectiveness, Beneficiaries, Center for Global Development, Charity Navigator, Effective Philanthropy, Evaluation, Hewlett Foundation, International aid, Making All Voices Count, OECD, ONE, OXFAM, post-project evaluation, self-sustainability, stakeholders, Sustainable development, USAID
Altruistic Accountability… for Sustainability
Many of us in international development feel a sense of responsibility for others to be well, and for our work to improve their lives as well as for the work to be done in good stewardship of aid resources and optimizing their impact. As Matthieu Ricard writes, "Altruism is a benevolent state of mind. To be altruistic is to be concerned about the fate of all those around us and to wish them well. This should be done together with the determination to act for their benefit. Valuing others is the main state of mind that leads to altruism." We also feel a responsibility to our international aid donors and taxpayers. We who implement, monitor and evaluate projects work to ensure that the altruism of aid is responsible to both donors and recipients.
Altruism appears most vividly when implementers issue appeals after disasters, with millions donated as a result, but unsung heroes are also development workers. Organizations such as Charity Navigator, ONE and Center for Global Development on how well US organizations spent funds and track donor-country policy accountability. Thoughtful donor studies such as French Development Agency’s OECD study report on the power of AidWatch and Reality of Aid intiatives in Europe for their taxpayers.
But who is pushing for our donor’s accountability to the country’s participants themselves? While USAID funds many program evaluations, some of which “identify promising, effective…strategies and to conduct needs assessments and other research to guide program decisions”, they are always at project end, rather than looking at sustainability of the outcomes and impacts, and focus on Congressional and domestic listeners. This is no funding and no small audience. The US Department of State/ USAID’s FY13 Summary report states that in fiscal year 2013, USAID had $23.8 billion to disburse, over $12 billion for programming. While total beneficiary (participant) numbers were not provided, emergency food assistance alone used $981 million for nearly 21.6 million people in 25 countries.
So who is a watchdog for what results? OXFAM may excellently highlight opportunities for better programming. 3ie does many studies looking at projected impact and does systemic reviews (but only three were post-project). Challenges such as Making All Voices Count may fund channels for country-nationals to hold their own governments responsible, but can in-country project participants ever demand sustainable results from anyone but their own governments? Herein lies the crux of the issue. Unless governments demand it (unlikely in ‘free’ aid), only pressure from donor country nationals (you? we) can push for changes.
At the core of Valuing Voices mission is advocacy for altruistic accountability of the sustainability of projects to country-ownership at all levels. For us, this involves valuing and also giving voice to those supported by, and also tasked with doing ‘sustainable projects’. Unless we know how sustainable our development projects have been, we have only temporarily helped those in greatest need. This means looking beyond whether funding continued to whether the benefits of an activity or even the existence of entire local NGOs tasked with this actually continued after funding was withdrawn. Unless we strive to learn what has continued to work best or failed to be continued after projects left in the views of the participants themselves, we can let down the very people who have entrusted us with hopes of a self-sustainable future of well being. Unless we listen to project staff and local partners to see what program staff felt they did right/wrong, and national partners felt they were supported to do keep doing right, we have minimized success of future projects. While increasing numbers of organizations such as Hewlett Foundation fund work to “increase the responsiveness of governments to their citizens’ needs. We do this by working to make governments more transparent and accountable,” the long-term effectiveness of our donor development assistance is not yet visible.
OECD guidelines on corporate accountability and transparency are illuminating. Adapting it from State-Corporate to Non-profit-State is interesting. For how well have we considered who ‘owns’ these development projects in practical terms from inception onward? Our donors? Implementing agencies? Local partners and communities?
OECD Guidelines on Corporate Governance of State-Owned Enterprises
1: The State Acting as an Owner
2: Equitable Treatment and Relations with Shareholders
3: Ensuring an Effective Legal and Regulatory Framework for State-Owned Enterprises
4: Transparency and Disclosure
How well do we design projects along these lines to do this successfully? Not terrifically:
-
Too often ‘stakeholders’ are not consulted at the very inception of the proposal design, only at design or implementation
-
Too often our work is aimed at making only our ‘client’- our donors- happy with our results rather than the country nationals who are tasked with self-sustaining them.
-
Too often handover is done at the 11th hour, not transferring it throughout implementation or building local capacity for those taking over be true projects’ owners.
But it is coming, through changing societal trends. On the data-access front, USAID (and differently, other European donors) have promised to modernize diplomacy and development by 2017 by “increas[ing] the number and effectiveness of communication and collaboration tools that leverage interactive digital platforms to improve direct engagement with both domestic and foreign publics. This will include increasing the number of publicly available data sets and ensuring that USAID-funded evaluations are published online, expanding publicly available foreign assistance data, increasing the number of repeat users of International Information.” Now to generate and add self- sustainability data to inform future projects!
Second, on the they-are-se front, our basic human nature, according to Ricard, lends itself to altruism. “Let's assume that the majority of us are basically good people who are willing to build a better world. In that case, we can do so together thanks to altruism. If we have more consideration for others, we will promote a more caring economy, and we will promote harmony in society and remedy inequalities.” Let’s get going…
by Kelsey Lopez | Apr 7, 2015 | Beneficiaries, Estonia, Evaluation, ex-post evaluation, IEG, Local Participants, Niger, Nigeria, Participants, Participation, post-project evaluation, PPAR, self-sustainability, Sustainability, Sustainable development, Valuing Voices, World Bank
IEG Blog Series Part II: Theory vs. Practice at the World Bank

In Part I of this blog series, I described my research process for identifying the level to which the World Bank (WB) is conducting participatory post project sustainability evaluations for its many international development projects. Through extensive research and analysis of the WB’s IEG database, Valuing Voices concluded that there is a very loosely defined taxonomy for ex-post project evaluation at the WB, making it difficult to identify a consistent standard of evaluation methodology for sustainability impact assessments.
Particularly, we were concerned with identifying examples of direct beneficiary involvement in evaluating long-term sustainability outcomes, for instance by surveying/interviewing participants to determine which project objectives were self-sustained…and which were not. Unfortunately, it is quite rare for development organizations to conduct ex–post evaluations that involve all levels of project participants to contribute to long-term information feedback loops. However, there was one document type in the IEG database that gave us at Valuing Voices some room for optimism: Project Performance Assessment Reports (PPARs). PPARs are defined by the IEG as documents that are,
“…based on a review of the Implementation Completion Report (a self-evaluation by the responsible Bank department) and fieldwork conducted by OED [Operations Evaluation Department, synonymous with IEG]. To Prepare PPARs, staff examines project files and other documents, interview operation staff, and in most cases visit the borrowing country for onsite discussions with project staff and beneficiaries” [1].
The key takeaway from this definition is that these reports supplement desk studies (ICRs) with new fieldwork data provided, in part, by the participants themselves. The IEG database lists hundreds of PPAR documents, but I focused on only the 33 documents that came up when I queried “post-project”.
Here are a few commonalities to note about the 33 PPARs I studied:
- They are all recent documents – the oldest document was published in 2004, and the most recent documents from 2014.
- The original projects that are assessed in the PPARs were finalized anywhere from 2-10+ years before the PPAR was written, making them true ex-posts
- They all claimed to involve mission site visits and communication with key project stakeholders, but they did not all claim to involve beneficiaries explicitly
Although the WB/IEG mentions that beneficiary participation takes place in “most” of the ex-post missions back to the project site in its definition of a PPAR, Valuing Voices was curious to know if there is a standard protocol for the level of participant involvement, the methods of data collection, and ultimately, the overall quality of the new fieldwork data collected to inform PPARs. For this data quality analysis, Valuing Voices identified these key criteria:
- Overall summary of evaluation methods
- Who was involved, specifically? Was there direct beneficiary participation? What were the research methods/procedures used?
- What was the level of sustainability (termed Risk to Development Outcome* after 2006) established by the PPAR?
- Was this different from the level of sustainability as projected by the preceding ICR report?
- Were participants involved via interviews? (Yes/No)
- If yes, were they semi-structured (open-ended questions allowing for greater variety/detail of qualitative data) or quantitative surveys
- How many beneficiaries were interviewed/surveyed?
- What % of total impacted beneficiary population was this number?
- Was there a control group used? (Yes/No)
Despite our initial optimism, we determined that the quality of the data provided in these PPARs was highly variable, and overall quite low. A summary of the findings is as follows:
1. Rarely were ‘beneficiaries’ interviewed
- Only 15% of the PPARs (5) gave details about the interview methodologies, but of this only 3% of the PPARs (1) described in detail how many participants were consulted, what they said and how they were interviewed (Nigeria 2014 [2]).
- 54% of the reports (18), mentioned beneficiary input in data collected in the post-project mission, but gave no specific information on the number of participants involved nor were their voices cited nor was any information included on the methodologies used. The vast majority only vaguely referenced the findings of the post project mission, rather than data collection specifics. A typical example of this type of report is Estonia 2004 [1]
- 30% of the PPARs (10) actually involved no direct participant/beneficiary participation in the evaluation process, with these missions only including stakeholders such as project staff, local government, NGOs, donors, consultants, etc.A typical example of this type of report is Niger 2005 [3]
These percentages are illustrated in Figure 1, below, which gives a visual breakdown of the number of reports that involved direct participant consultation with detailed methodologies provided (5), the number of reports where stakeholders were broadly consulted but no specific methodologies were provided (18), and the number of reports where no participants were directly involved in the evaluation process (10).

2. Sustainability of project outcomes was unclear
- In 54% of cases, there was some change in the level of sustainability from the original level predicted in the ICR (which precedes and informs the PPAR) to the level established in the PPAR. Ironically, of the 33 cases, 22 of them were classified as Likely or Highly Likely or Significantly Likely to be sustainable, yet participants were not asked for their input.
- So on what basis was sustainability judged? Of the three cases where there was high participant consultation, the Nigerian project’s (where they asked 10% of participants for feedback) sustainability prospects was only moderate while India (also 10% feedback) and Kenya (14-20%) both were classified as likely to be sustainable.
Along the Y axis of Figure 2, below, is the spectrum of sustainability rankings observed in the PPARs, which range from “Negligible to Low” up to “High”. For each of the projects analyzed (there are 60 total projects accounted for in this graph, as some of the PPARs covered up to 4 individual projects in one report), the graph illustrates how many projects consulted participants, and how many failed to do so, for each evaluation outcome. As we can see, the majority of cases that were determined to be highly or significantly sustainable either did not consult participants directly or only consulted stakeholders broadly, with limited community input represented in the evaluation. These are interesting findings, because although there is a lot of supposed sustainability being reported, very few cases actually involved the community participants in a meaningful way (to our knowledge, based on the lack of community consultation discussed in the reports). However, unless these evaluations are taking place at grassroots level, engaging the participants in a conversation about the true self-sustainability outcomes of projects, you can’t really know how sustainable the project is by only talking with donors, consultants, governments, etc. Are the right voices really being represented in this evaluation process? *Note: the “Sustainability” ranking was retitled “Risk to Development Outcomes” in 2006.

While projects were deemed sustainable, this is based on very little ‘beneficiary’ input. The significance of this information is simple: not enough is being done to ensure beneficiary participation in ALL STAGES of the development process, especially in the post-project time frame, even by prominent development institutions like the WB/IEG. While we commend the Bank for currently emphasizing citizen engagement via beneficiary feedback, this still seems to be more of a guiding theory than a habitualized practice [4]. Although all 34 documents I analyzed claimed there was “key stakeholder” or beneficiary participation, the reality is that no consistent procedural standard for eliciting such engagement could be identified.
Furthermore, the lack of specific details elaborating upon interview/survey methods, the number of participants involved, the discovery of any unintended outcomes, etc. creates a critical information void. As a free and public resource, the IEG database should not only be considered an important internal tool for the WB to catalog its numerous projects throughout time, but it is also an essential external tool for members of greater civil society who wish to benefit from the Bank’s extensive collection of resources – to learn from WB experiences and inform industry-wide best practices.
For this reason, Valuing Voices implores the World Bank to step up its game and establish itself as a leader in post-project evaluation learning, not just in theory but also in practice. While these 33 PPARs represent just a small sample of the over 12,000 projects the WB has implemented since its inception, Valuing Voices hopes to see much more ex-post project evaluation happening in the future through IEG. Today we are seeing a decisive shift in the development world towards valuing sustainable outcomes over short-term fixes, towards informing future projects based on long-term data collection and learning, and towards community participation in all stages of the development process…
If one thing is certain, it is that global emphasis on sustainable development will not be going away anytime soon…but are we doing enough to ensure it?
Sources:
[1] World Bank OED. (2004, June 28). Project Performance Assessment Report: Republic of Estonia, Agriculture Project. Retrieved from http://documents.worldbank.org/curated/en/173891468752061273/pdf/295610EE.pdf
[2] World Bank OED. (2014, June 26). Project Performance Assessment Report: Nigeria, Second National Fadama Development Project. Retrieved from https://ieg.worldbankgroup.org/sites/default/files/Data/reports/Nigeria_Fadama2_PPAR_889580PPAR0P060IC0disclosed07070140_0.pdf
[3] World Bank OED. (2005, April 15). Project Performance Assessment Report: Niger, Energy Project. Retrieved from http://documents.worldbank.org/curated/en/899681468291380590/pdf/32149.pdf
[4] World Bank. (n.d.). Citizen Engagement: Incorporating Beneficiary Feedback in all projects by FY 18. Retrieved 2015, from https://web.archive.org/web/20150102233948/http://pdu.worldbank.org/sites/pdu2/en/about/PDU/EngageCitizens
by Jindra Cekan | Mar 14, 2015 | Accountability, Aid effectiveness, Evaluation, Food for Peace (FFP), Food security, IATI, International aid, Local Participants, Maternal Child Health, MCHN, Open Data, Project design, Sustainability, Sustainable development
Are We Done Yet?
When are we off the hook, so to speak, for the well-being of the participants whom we said we'd make healthier, better fed, more educated, safer, etc?
America’s Agency for International Development (USAID) is the main channel for international development aid. It is also an organization interested in learning from its programming and numerous contracts support such work. One such contract by FHI360/FANTA was Food for Peace tasking them to review the agency’s Title II development food aid from 2003-2009 covering 28 countries. This Second Food Aid and Food Security Assessment (FAFSA-2) Summary found that such programs can “reduce undernutrition in young children, improve health and nutrition outcomes, and increase access to income and food” and also found practices that did not work well.
While USAID has made enormous strides in the intervening six years on monitoring and evaluation (I was a consultant to USAID/PPL/LER from 2013-14), excellent recommendations that would support great, sustainable programs are unfulfilled:
Recommendations #1, 4 “USAID/FFP should develop an applied research agenda and sponsor studies that focus on the implementation of Title II programs in the field to better define what works and what does not…. [and] should select the review panel for new Title II applications… and give reviewers a ‘cheat sheet’ on interventions and approaches that USAID/FFP is and is not interested in funding because they work better or do not work as well, [and] provide this same information in the Request for Assistance” [Request for proposals].
Yes, all across our industry there is little learning from past evaluations for future design and Valuing Voices believes local participants and stakeholders need to be consulted to tell us what (still) works and what they want more of not only during implementation but long after. Their voices must support great design, as it’s their lives we go there to improve; they must be involved in the design of these original requests that non-profits design and fulfill. Further, the study found that only 1/3 of all evaluations were included in USAID’s database[1], and as Valuing Voices’ partner Sonjara has written in our blog, aid transparency requires data retention and access for learning to happen.
Recommendation #3 “USAID/FFP should include options for extensions of awards or separate follow-on awards to enable USAID/FFP to continue to support high-performing programs beyond five years and up to ten years… [as] longer implementation periods are associated with greater impact.”
This would address the ‘how much impact can we accomplish in 1, 3, 5 years” question that many of us in international non-profits ask ourselves. Finally, the graphic below is self-explanatory – USAID sees its role ending at close-out.
The crux lies in their honest statement: "It was beyond the scope and resources of the FAFSA-2 to explore in any depth the sustainability of Title II development programs after they ended." While they state that there is merit in having impact while you intervene, such as "having a positive impact on the nutritional status of the first cohort of children is of immense benefit in its own right", they go on to say that "ideally, one would like to see mothers continuing positive child feeding practices and workers continuing to deliver services long after programs end… [yet] whether the [maternal child health and nutrition] interventions are sustainable beyond one generation is unknown and would require research." This is because funding is pre-programmed, fixed to end within set 1, 3, 5 year increments, and no one goes back to learn how it all turned out. This is what most needs to change, this illusion that what happens after closeout is no longer our issue, that the ‘positive impact’ we had while there is enough.
They are not alone. I think of NORAD, the Government of Norway's development arm as very progressive. So I went to NORAD's website and searched for 'ex-post' (we do a lot of that at ValuingVoices). So like our World Bank blog on finding real ex-post evaluations, many many things are considered 'ex-post', including one actual evaluation in Palestine with fieldwork which asked participants and a few that looked at institutional sustainability. Many of the 100+ 'finds' were actually documents recommending ex-post. Typical of our other searches of other donors. I emailed NORAD whether there were more with participant voices, yet they assured me they did them. Maybe our problem is in definitions and taxonomy again. Maybe we should call them post-project participant feedback?
Most of my colleagues would agree that the sustainability of activities aimed at making communities food secure in the long-term and independent of aid is a shared goal, one which short-term assistance aimed at huge impacts such as to ‘make communities food secure’ and ‘sustainably decrease malnutrition’ (common proposal goals) is unrealistic. We need participant voices to teach us how well we served them. We need to return, learn “what works and what does not”, and Value Voices in true sustained partnership. We all look forward to being done.
[1] “Another major obstacle to transparency and learning from the Title II program experience was the fact that only one-third of the final evaluations were publicly available on the Development Experience Clearinghouse (DEC), despite the requirement that Awardees post them to the DEC…. [There was a lack of] cross-cutting studies or in-depth analyses of Title II evaluation results to advance organizational learning [and] much greater use could be made of the evaluation data for systematic reviews, meta-analyses, secondary analyses, and learning.”